The City requires annual renewals by December 31; the Code requires renewal completion by January 1. The application remains incomplete until its required documents and payment arrive.
- Each address or classification requires a separate application. Owner-occupied filings include the original notarized primary-residence affidavit, identification, and homestead proof or a redacted recent tax return.
Condominium and HOA properties supply authorization and governing documents. ADUs supply the occupancy certificate; entities complete corporate disclosure.
The 2026 application requires a separate STR Additional Information form for each unit.
For this data form, exemptions cover units owned, operated or otherwise managed by a municipal housing authority; accommodations in hospitals, convents, churches, religious facilities or extended-care facilities; dormitories owned and operated by a higher-education institution or Portland Public Schools; units in buildings containing only two, three or four dwellings where the owner currently occupies one as a principal residence; units in owner-occupied single-family homes; accessory dwelling units as defined in Chapter 14; and publicly rent-controlled or subsidized units, including Section 8 and General Assistance.
Identify each applicable exemption to skip the remaining data fields. These exemptions apply to the Additional Information form’s remaining fields; annual STR registration and property-specific operating limits still apply.
For other units, provide the requested nightly base rent, prior and current rent, categorized increases, remaining banked rent, deposits and other payments, bedroom and bathroom counts, and kitchen status.
- The first mainland owner-occupied unit costs $100, with units two through five priced at $250, $500, $1,000, and $2,000. The first non-owner-occupied or ADU unit costs $200, with units two through five at $500, $1,000, $2,000, and $4,000. Fees add cumulatively, counting lower-rate classifications first. Documented sprinklers, monitored alarms, and no-smoking lease terms can reduce the fee by at most $20 per unit. A missed January 1 renewal forfeits the right to renew and a later filing becomes a new application.
Return the complete application and supporting documents to City of Portland Licensing & Registration, 389 Congress Street, room 307, Portland, ME 04101. Pay at City Hall’s Business Licensing office by cash, credit card, or check, or mail a check payable to City of Portland with the rental address in the memo. For online payment, staff email an invoice after processing the application. Credit-card payments carry a 2.65% processing fee; e-check processing costs one dollar.
A unit used for both short- and long-term rental needs separate registrations. A new owner, manager or responsible person applies within 30 days; a newly entering rental registers within 14 days. Renewal reports nights for November 1–October 31. Registration takes effect only after the number is issued and documents and fees are complete; display that number in the unit and advertisements and consent to inspection. Renew any long-term units on the same parcel before the non-owner-occupied STR or risk losing the STR renewal. Non-owner-occupied renewals can use email; owner-occupied renewals require the original notarization.
The late-fee provisions charge $50 per unit after January 15 or fourteen days after entering the rental market, whichever is later, and $200 after February 15 or forty-five days after entering the rental market, whichever is later, subject to a discretionary waiver by the Permitting and Inspections Director upon a showing of both hardship and good cause for the untimely renewal. Separately, section 6-154 ends the STR renewal right on January 1; paying a late fee does not restore a lost grandfathered renewal. An unresolved disorderly-house designation causes revocation and 12 months of ineligibility, after which operating authority requires a new application; later designations can prohibit the owner or occupancy. Code violations can prevent applications and renewals. The City program stops new tenant-occupied licenses as of September 1, 2025. Section 6-153(d) bars new tenant-occupied registrations beginning January 1, 2026 and permits continued renewal by tenants validly registered on December 31, 2025, subject to the Article’s requirements.